CUTE-I Launch News & Operation Report




2003/08/08 07:21:05-07:33:43 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/08 05:40:06-05:55:25 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 20min) is transmitted. We downlinked SRAM data successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/08 04:02:45-04:10:42 Satellite Pass.


2003/08/07 19:03:06-19:12:24 Satellite Pass.


2003/08/07 17:19:04-17:34:34 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(nearby end of SRAM adress) successfully. CMOS Sun Sensor works well.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/07 15:41:07-15:53:25 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. Power of CMOS Sun Sensor is on. We tried to rotate onboard DC motor. The motor works successfully.

Analyzed CW Telemetry


2003/08/07 07:40:55-07:51:57 Satellite Pass.


2003/08/07 05:59:23-06:14:47 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(nearby end of SRAM adress) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/07 04:20:50-04:31:48 Satellite Pass.


2003/08/06 19:25:04-19:29:38 Satellite Pass.


2003/08/06 17:38:31-17:53:45 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(nearby end of SRAM adress) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/06 15:59:32-16:13:06 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(nearby end of SRAM adress) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/06 08:00:57-08:09:47 Satellite Pass.


2003/08/06 06:18:43-06:33:55 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(nearby end of SRAM adress) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/06 04:39:25-04:52:14 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(nearby end of SRAM adress) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/05 17:58:11-18:12:49 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/08/05 16:18:10-16:32:39 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/08/05 14:46:00-14:47:45 Satellite Pass.


2003/08/05 08:21:33-08:26:54 Satellite Pass.


2003/08/05 06:38:08-06:52:53 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/05 04:58:15-05:12:18 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/04 18:18:06-18:31:46 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/04 16:37:01-16:52:07 Satellite Pass. This is 200th operation!!! Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/04 15:01:58-15:09:26 Satellite Pass.


2003/08/04 06:57:39-07:11:38 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/04 05:17:15-05:32:06 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/03 18:38:19-18:50:29 Satellite Pass. We could not operate by a power failure in campus.


2003/08/03 16:56-17:11 Satellite Pass. We could not operate by a power failure in campus.


2003/08/03 15:19-15:29 Satellite Pass. We could not operate by a power failure in campus.


2003/08/03 07:17-07:30 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/03 05:36-05:51 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/03 03:59-04:06 Satellite Pass.


2003/08/02 18:58-19:08 Satellite Pass. We could not operate by a power failure in campus.


2003/08/02 17:15-17:30 Satellite Pass. We could not operate by a power failure in campus.


2003/08/02 15:37-15:49 Satellite Pass. We could not operate by a power failure in campus.


2003/08/02 07:37-07:48 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/02 05:55-06:11 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/02 04:17-04:27 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/01 17:34-17:50 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/01 15:55-16:09 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/01 07:57-08:06 Satellite Pass.


2003/08/01 06:14-06:30 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/08/01 04:35-04:48 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/31 17:54-18:09 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/31 16:14-16:28 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/31 08:17-08:23 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/31 06:34-06:49 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/31 04:54-05:08 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/30 18:14-18:28 Satellite Pass.


2003/07/30 16:33-16:48 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/30 14:58-15:05 Satellite Pass.


2003/07/30 06:53-07:08 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/30 05:13-05:28 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/29 18:34-18:46 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/29 16:52-17:07 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/29 15:16-15:25 Satellite Pass.


2003/07/29 07:13-07:26 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/29 05:32-05:47 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/29 03:56-04:02 Satellite Pass.


2003/07/28 18:54-19:05 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/28 17:11-17:27 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/28 15:34-15:45 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/28 07:33-07:44 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/28 05:51-06:07 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/28 04:13-04:23 Satellite Pass.


2003/07/27 19:16-19:23 Satellite Pass.


2003/07/27 17:30-17:46 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/27 15:52-16:05 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/27 07:53-08:02 Satellite Pass.


2003/07/27 06:11-06:26 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/27 04:32-04:44 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/26 17:50-18:05 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/26 16:10-16:25 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/26 08:13-08:20 Satellite Pass.


2003/07/26 06:30-06:45 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/26 04:50-05:04 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/25 18:10-18:24 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/25 16:29-16:44 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/25 14:55-15:01 Satellite Pass.


2003/07/25 06:50-07:04 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/25 05:09-05:24 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/24 18:30-18:43 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/24 16:48-17:03 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/24 15:12-15:21 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/24 07:09-07:22 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/24 05:28-05:44 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/24 03:52-03:57 Satellite Pass.


2003/07/23 18:50-19:01 Satellite Pass.


2003/07/23 17:07-17:23 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/23 15:30-15:41 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/23 07:29-07:41 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/23 05:48-06:03 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/23 04:10-04:19 Satellite Pass.


2003/07/22 19:11-19:19 Satellite Pass.


2003/07/22 17:27-17:42 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/22 15:48-16:01 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/22 07:49-07:59 Satellite Pass.


2003/07/22 06:07-06:22 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry


2003/07/22 04:28-04:40 Satellite Pass.


2003/07/21 17:46-18:01 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/21 16:07-16:21 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/21 08:09-08:17 Satellite Pass.


2003/07/21 06:26-06:41 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/21 04:47-05:00 Satellite Pass.


2003/07/20 18:06-18:20 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/20 16:25-16:40 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/20 14:52-14:57 Satellite Pass.


2003/07/20 08:30-08:33 Satellite Pass.


2003/07/20 06:46-07:00 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/20 05:06-05:20 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/19 18:26-18:39 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/19 16:44-16:52 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/19 15:09-15:17 Satellite Pass. Received CW beacon.


2003/07/19 07:05-07:19 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.


2003/07/19 05:25-05:40 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/19 03:49-03:51 Satellite Pass.


2003/07/18 18:46-18:58 Satellite Pass. Received CW beacon.


2003/07/18 17:03-17:11 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry

Current Status of Acquiring SRAM data


2003/07/18 15:26-15:32 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/18 07:25-07:37 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/18 05:44-05:59Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry


2003/07/18 04:06-04:15 Satellite Pass. Received CW beacon. This is 100th operation!!

Analyzed CW Telemetry


2003/07/17 19:07-19:16 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/17 17:23-17:38 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry


2003/07/17 15:45-15:57 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry


2003/07/17 07:45-07:55 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/17 06:03-06:19 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry


2003/07/17 04:24-04:36 Satellite Pass.


2003/07/16 19:30-19:32 Satellite Pass.


2003/07/16 17:42-17:57 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/16 16:03-16:17 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/16 04:43-04:56 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.

Analyzed CW Telemetry


2003/07/16 08:05-08:13 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/16 06:22-06:38 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.

Analyzed CW Telemetry


2003/07/16 04:43-04:56 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.

Analyzed CW Telemetry


2003/07/15 18:02-18:16 Satellite Pass. Received CW beacon.


2003/07/15 16:22-16:36 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.


2003/07/15 14:49-14:52 Satellite Pass.


2003/07/15 08:26-08:30 Satellite Pass.


2003/07/15 06:42-06:57 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.


2003/07/15 05:02-05:16 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.


2003/07/14 18:22-18:35 Satellite Pass. Received CW beacon.


2003/07/14 16:41-16:56 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after separation) successfully.


2003/07/14 15:05-15:13 Satellite Pass. Received CW beacon.


2003/07/14 07:01-07:15 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.


2003/07/14 05:21-05:36 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.

Operation at Titech GS...


2003/07/13 18:42-18:54 Satellite Pass. Received CW beacon.


2003/07/13 17:00-17:15 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/13 15:23-15:33 Satellite Pass. Received CW beacon.


2003/07/13 07:21-07:34 Satellite Pass. Received CW beacon.


2003/07/13 05:40-05:55 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/13 04:03-04:11 Satellite Pass.


2003/07/12 17:19-17:34 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/12 15:41-15:53 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/12 07:41-07:52 Satellite Pass. Received CW beacon.


2003/07/12 05:59-06:15 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.


2003/07/12 04:21-04:32 Satellite Pass. Ham in Japan received CW beacon from CUTE-I.


Satellite Pass. Received CW beacon. 2003/07/11 19:25-19:29 Satellite Pass. Received CW beacon.


2003/07/11 17:38-17:54 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/11 15:59-16:13 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/11 08:01-08:10 Satellite Pass. Received CW beacon.


2003/07/11 06:19-06:34 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/11 04:39-04:52 Satellite Pass. Received CW beacon.


2003/07/10 17:58-18:13 Satellite Pass. We received CW beacon by handy HAM transceiver at Hongo campus, University of Tokyo.


2003/07/10 16:18-16:33 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 5min) is transmitted.


2003/07/10 14:46-14:48 Satellite Pass. Max elevation during this pass is 0.2 deg. Therefore we have not operated.


2003/07/10 08:21-08:27 Satellite Pass. Received CW beacon.


2003/07/10 06:38-06:53 Satellite Pass. Received CW beacon.


2003/07/10 04:58-05:12 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/09 18:18-18:32 Satellite Pass. Received CW beacon. FM packet (SRLL, 1200bps, 10min) is transmitted.


2003/07/09 16:37-16:52 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/09 15:02-15:09 Satellite Pass. Received CW beacon. This is 50th operation!


2003/07/09 06:57-07:12 Satellite Pass. Received CW beacon.


2003/07/09 05:17-05:32 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted. We downlinked SRAM data(after deployment action) successfully.


2003/07/08 18:38-18:50 Satellite Pass. Received CW beacon.


2003/07/08 16:56-17:11 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted. We downlinked SRAM data successfully.


2003/07/08 15:19-15:30 Satellite Pass. Received CW beacon.


2003/07/08 07:17-07:30 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted.


2003/07/08 05:36-05:52 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.


2003/07/08 03:59-04:07 Satellite Pass. Received CW beacon.


2003/07/07 18:59-19:09 Satellite Pass. Received CW beacon.


2003/07/07 17:15-17:31 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 20min) is transmitted.


2003/07/07 15:37-15:49 Satellite Pass. Received CW beacon.


2003/07/07 07:37-07:48 Satellite Pass. Received CW beacon. FM packet (SRLL, 1200bps, 10min) is transmitted.


2003/07/07 05:55-06:11 Satellite Pass. Received CW beacon. FM packet (SRLL, 1200bps, 15min) is transmitted.


2003/07/07 04:17-04:28 Satellite Pass. Received CW beacon.


2003/07/06 19:21-19:26 Satellite Pass. Received CW beacon.


2003/07/06 17:35-17:50 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted.


2003/07/06 15:56-16:09 Satellite Pass. Received CW beacon.


2003/07/06 07:57-08:06 Satellite Pass. Received CW beacon. We made sure that onboard battery has been fully charged.


2003/07/06 06:15-06:30 Satellite Pass. Received CW beacon.


2003/07/06 04:36-04:48 Satellite Pass. Received CW beacon. Power of CMOS Sun Sensor is off.

Analyzed CW Telemetry


2003/07/05 17:54-18:09 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/05 16:14-16:29 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 10min) is transmitted. We have conducted sensor test, and verified that onboard sensors works well.

Analyzed CW Telemetry


2003/07/05 08:17-08:24 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/05 06:34-06:49 Satellite Pass. Received CW beacon. FM packet (Ax.25, 1200bps, 15min) is transmitted.

Analyzed CW Telemetry


2003/07/05 04:54-05:08 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/04 18:14-18:28 Satellite Pass. Received CW beacon. We could receive CW beacon by handy HAM transceiver.

Analyzed CW Telemetry


2003/07/04 16:33-16:48 Satellite Pass. Received CW beacon. FM packet (SRLL, 1200bps, 10min) is transmitted. We downlinked SRAM data (0.6 - 20.6 seconds after separation) successfully.

Temperature datas of walls from SRAM

Temperature datas of onboard sensors from SRAM

Temperature datas of onboard components from SRAM

Analyzed CW Telemetry

 


2003/07/04 14:58-15:05 Satellite Pass. Received CW beacon.

 


2003/07/04 06:54--07:08 Satellite Pass. Received CW beacon.

 


2003/07/04 05:13-05:28 Uplinked command are executed. We tried to transmit FM packet (SRLL, 1200bps, 15min).Received and decoded FM telemetry at Titech Ground Station(JQ1YCZ) successfully. We think SRLL will have higher capability to decode the FM packet than AX.25. Now we are analyzing...

Temperature Data

Voltage Data

Solar Cell Current Data

Solar Cell Voltage Data


2003/07/03 18:34-18:47 Satellite Pass. Received CW beacon.

 


2003/07/03 16:52-17:08 Satellite Pass. Received CW beacon. Uplinked command are executed. FM packet (Ax.25, 1200bps, 25min) is transmitted. Received and decoded FM telemetry at Titech Ground Station(JQ1YCZ). Sun Sensor works well.

Temperature Data

 


2003/07/03 15:16-15:26 Satellite Pass. Titech Ground Station(JQ1YCZ) received CW beacon from XI(JQ1YCV). Ham in Japan received CW beacon from CUTE-I.

 


2003/07/03 07:13-07:26 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/03 05:32-05:48 Satellite Pass. Received CW beacon. Uplinked command is executed successfully. FM packet (Ax.25, 1200bps, 25min) is transmitted.Received and decoded FM telemetry at Titech Ground Station(JQ1YCZ) and some hams in Japan.

Analyzed CW Telemetry


2003/07/03 03:56-04:02 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/02 18:55-19:05 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/02 17:12-17:27 Satellite Pass. Received CW beacon. Uplinked command is executed successfully. FM packet (Ax.25, 1200bps, 15min) is transmitted.Received and decoded FM telemetry at Titech Ground Station(JQ1YCZ) and some hams in Japan.

Analyzed CW Telemetry


2003/07/02 15:34-15:46 Satellite Pass. Received CW beacon. Uplinked command is executed. Power of CMOS Sun Sensor is on.

Analyzed CW Telemetry


2003/07/02 07:33-07:45 Satellite Pass. Received CW beacon. Uplinked command is executed successfully.

Analyzed CW Telemetry


2003/07/02 05:52-06:07 Satellite Pass. Received CW beacon.Uplinked command is executed successfully. FM packet (Ax.25, 1200bps, 5min) is transmitted.Received and decoded FM telemetry at Titech Ground Station(JQ1YCZ)!!!

Analyzed FM Telemetry (Temperatures in CUTE-I)

Analyzed CW Telemetry


2003/07/02 04:14-04:24 Satellite Pass. Received CW beacon. CUTE-I onboard Rx works well.

Analyzed CW Telemetry


2003/07/01 19:16-19:23 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/01 17:31-17:38 Satellite Pass. Received CW beacon.
Uplinked command is executed successfully (The interval between each frame of the CW telemetry is changed to 0 second.)

Analyzed CW Telemetry


2003/07/01 15:52-16:05 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/01 07:53-08:03 Satellite Pass. Received CW beacon. Jammer crowded at same frequency band...

Analyzed CW Telemetry


2003/07/01 06:18 Uplink to CUTE-I is successful.

 


2003/07/01 06:11-06:26 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/01 04:30 Satellite Pass. CUTE-I onboard RF-receiver works well.

 


2003/07/01 04:32-04:44 Satellite Pass. Received CW beacon.

Analyzed CW Telemetry


2003/07/01 04:32 First Contact with CUTE-I at Titech Ground Station(JQ1YCZ)!!! Received CW beacon from CUTE-I !!!


2003/07/01 03:19 From CW telemetry received by G6LVB, successfull deployment of solar cell paddle of CUTE-I is confirmed !!!

 


2003/07/01 02:53 G6LVB received CW beacon from CUTE-I in LONDON !!!!

 


2003/07/01 Photos of Rockot Launch

 


2003/07/01 00:48 CUTE-I Separation!!!

 


2003/07/01 00:47 MOST Separation!! CUTE-I will separate after 70 seconds.

 


2003/07/01 00:44 Control Center in Russia received the telemetry from MIMOSA!!

 


2003/07/01 00:22 Photos in Mission Control Center

 


2003/07/01 00:02 MIMOSA Separation !

 


2003/06/30 23:20 ROCKOT is flying smoothly

 


2003/06/30 23:15 ROCKOT LIFT-OFF !!!!!!!!!!!!!!!!!!!!!!

 


2003/06/30 23:10 5 minutes before lift-off

 


2003/06/30 23:05 10 minutes before lift-off

 


2003/06/30 22:50 The power source of upper stage(BREEZE) are switched to onboard battery.

 


2003/06/30 22:30 40 minutes before lift-off.

 


2003/06/30 20:00 Titech Ground Station(JQ1YCZ) is getting ready for CUTE-I launch and operation.

 


2003/06/30 16:00: Wind velocity is about 9m/sec. Launch will GO.

 


2003/06/30 14:00: Final Communication test between Plesetsk and Japan.

 




Japanese Version This Page is English Version



Copyright(C) 2000,2001 -CubeSat- All rights reserved.
Tokyo Institute of Technology    Laboratory for Space Systems (LSS)
TITECH CUBESAT PROJECT TEAM
Contact : CUTE Project team