CUTE-I Status |
|
CUTE-I Current Status. |
|
Deployed Antennas & Solar Cell Paddle Successfully Transmit CW beacon continuously, Onboard-Rx works well Transmit FM Packet(AX.25, 1200bps) successfully by uplinked command Sun Sensor works well Transmit FM Packet(SRLL, 1200bps) successfully by uplinked command Downlink SRAM data (immediately after separation) successfully Conduct sensor test. All onboard sensors work well |
|
Operation Report [2005/07/12 updated] | |
Results of Telemetry Analysis [2005/7/12 updated] | |
CUTE-I Scheduled Orbit | |
Altitude 820km (+/- 25km) Inclination 98.7deg(SSO) Ascending node Time 18:00 (UTC) |
|
This parameters(TLE) are bloadcasted on NORAD. This is the latest TLE of CUTE-I. | |
CUTE-I(2003031E) [2007/01/08 updated] |
|
Visible pass in your area can be calculated here("Orbit...") | |