Top Launch & Operation
Launch Date : 28/Apr/2008 03:53:51 (UTC)
Launch Site : Indian Space Research Organization (ISRO) Satish Dawan Space Center (SDSC)
Launch Vehicle:ISRO PSLV (More information is available at "Launch Vehicle" Page.)
Orbit: Sun Synchronous
Inclination: ~98deg
Height: ~630km
Ascending Node: 10:30am
Two-Line Elements(TLE)
Cute-1.7 II
1 XXXXXU 08XXXXXU 08119.17434074 .00000000 00000-0 00000-0 0 0000X
2 XXXXX 97.9469 179.2192 0007735 274.3086 295.7329 14.7975543400001X
Cute-1.7 + APD IIis separates from the PSLV rocket after the main satellite separates.
Cute-1.7 + APD II transmits CW telemetry. Detailed information will be explained in
"How to receive".
the GMSK or FM telemetry schedules can be found at
GSSV(Ground Station Schedules Viewer).
Cute-1.7 + APD IImission schedule
After separation from the rocket, Cute-1.7 + APD II automatically deploys its antennas
and begins to transmit CW telemetry. First, the operation center confirms electric
power management. After a correct power balance is confirmed, various missions will
be conducted, the Tether deployment mission being the final one.